Viaduct Deck Replacement & Strengthening at Ponts Mill
April 17, 2025

Structural Works – Viaduct Deck Replacement & Strengthening at Ponts Mill, Cornwall


In March, Protech Infrastructure undertook a complex and rewarding structural project at Ponts Mill Viaduct in Cornwall. Working closely with our trusted partners – Explore Plant, Plantforce, Volker, Torrent Trackside, and GPX Engineering – we successfully delivered essential deck replacement and structural strengthening works on this historic section of the railway.


This was a challenging project, one that demanded specialist knowledge, seamless coordination, and precision delivery. It’s exactly the kind of work where collaboration across disciplines makes all the difference – and where Protech’s reputation for excellence comes to the fore.


At Protech Infrastructure, we pride ourselves on the depth of our expertise and speed of delivery. With multiple in-house departments dedicated to engineering, monitoring, logistics, and support services, we’re able to manage and execute complex infrastructure projects end-to-end. It’s this full-service capability – along with our commitment to quality – that keeps clients like BAM UK & Ireland coming back.


Our scope of works included:


  • Renewal of 45 meters of single line track using composite sleepers, including two gathering panels and reinstatement of guard rails with MOW clip fastenings
  • Tamping to achieve precise design geometry
  • Installation of a new TTS troughing route through the viaduct
  • Back-of-wall drainage installation at both abutments


But that’s only part of the story. Our structural and track monitoring teams were on hand throughout the works, deploying state-of-the-art technology to ensure safety, compliance, and performance. Meanwhile, our haulage division kept the project moving smoothly by delivering all required materials – including 18.288 meter rails – directly to site.


At the heart of a successful job like this is partnership: working with experts, sharing knowledge, and staying focused on the common goal – delivering for the client. We’re proud to have played a key role in this project and grateful to our partners for their professionalism and support.


We look forward to working together again soon on the next successful collaboration.



a person is standing on a train track .
By Protech November 4, 2021
We pride ourselves on the accuracy of our track monitoring services. Working in accordance with Network Rail Standards NR/L2.TRK/3100 and NR/L2/CIV/177 we provide both manual and automated track monitoring systems to deliver high accuracy, cost-effective track monitoring data. We can facilitate a range of remote monitoring from temperature to vibration, enabling 24-hour access to data on the conditions of the track and the assurance of early detection in case of geometry irregularities. Get in touch with us today to find out more about how our automated monitoring can support your project.
View our Capability Statement
By Protech July 13, 2021
View and download the Protech Capability Statement
a man is cutting a piece of metal on a train track at night .
By Protech October 7, 2020
Here at Protech Rail Engineering, we are proud to have passed our annual RISQS audit. The Railway Industry Supplier Qualification Scheme (RISQS) features a smarter, quicker, easier platform and enhanced audit services, providing the rail industry with supplier assurance fit for the future. Protech Rail Engineering prides itself in its quality service and the RISQS accreditation is just one of the many certifications and accreditations we hold to prove to our clients that we supply highly skilled railway engineers and competently carry out works as indicated in the RICCL codes we are accredited with. Another great success from the team, huge thanks to all those involved!